Flagship projects

Construction of Flyover at Muradpur – Gate 2 No & GEC Junction, Chittagong Development Authority.

Bangladesh Water Development, Emergency 2007 Cyclone Recovery & Restoration Project.

Construction of 696.75m long P.C. Girder Bridge on Bhangagate-Amtala GC via Moricha, Nouli Bazar Road over Bhoirab River” at Jessore under LGED.

Construction of 600.70m Long P.C. Girder Bridge over Madhumati River at Alangkhali Ghat under Mohammadpur Upazila, District: Magura” under LGED.

Construction of 677.00m Long Pre-Stressed Girder Bridge over Andhermanik River on Kalapara-Baliatoli-Gongamoti Road at Kalapara Upazila under Patuakhali District under LGED.

Km. 61.5 Railway New Track Doubling between Laksam & Chinki Astana, a sub-project of the “Dhaka – Chittagong Railway Development Project”.

Km. 61.5 Railway New Track Doubling between Laksam & Chinki Astana, a sub-project of the “Dhaka – Chittagong Railway Development Project”.

163 MW Combined Cycle Power Plant At Fenchuganj, Sylhet under Kushiara Power Plant Company Ltd.

Steel Girder Bridge of Bangladesh Railway under construction of Km. 61.5 Railway New Track between Laksam & Chinki Astana, a sub-project of the “Dhaka – Chittagong Railway Development Project”.

Construction of Distribution Reservoirs and Overhead Tanks under Khulna Water Supply & Sewerage Authority (KWASA) Khulna.

Remodelling of Chittagong Railway Station Yard, a sub-project of “Dhaka-Chittagong Railway Development Project”.

Construction of Kashiani-Gopalganj-Tungipara Km. 32.35 New BG Rail Line of Bangladesh Railway.

At SSAE/Way/NRC section: Mechanical tamping of existing track between NRC-ASZ section.

At SSAE/Way/CTG section: Mechanical tamping of existing track between CTG – STK section.

Package WD – 1: Through renewal of worn-out rail & allied works in Chinkiastana – Ashuganj section of Bangladesh railway.

Package WD1: Construction of Station Building, Platform, platform shed & Track construction works (1.07 Km.) at Kaliakoir.

Package WD1: Construction of Station Building, Platform, platform shed & Track construction works (1.07 Km.) at Kaliakoir.

Construction of Dual Gauge Double Rail Line & Conversion of Existing Rail Line into Dual Gauge Km 72 Long between Akhaura & Laksam.

Complete Renewal of Track & other ancillary works of 52.20 Km in Saidpur – Chilahati Section of Bangladesh Railway.

Package No. WD – 3, Conversion of MG Track into dual Gauge from Km 462.00 to 512.00

Package GD – 01: Supply of 1350 Nos. Wooden Sleeper under Division Engineer – II, Paksey.

Package GD – 02: Supply of 215 Cum. Wooden Sleeper under Division Engineer, Parbatipur.

Package GD – 08: Supply of 1500 Nos. Wooden Sleeper under Division Engineer – I, Paksey.

Package GD – 09: Supply of 215 Cum. Wooden Sleeper under Division Engineer, Paksey & Lalmonirhat.